Thursday, April 22, 2010

Changing the zincs


Since Airborne has been hauled out I changed the zincs. Right is a before picture. I'll take an after one later in May before her keel is wet again. Other layup maintenance includes flushing saltwater from the cooling system with freshwater. I also bought new fuel filters to help with random depowering of the engine. The fuel filter will be installed after Airborne is docked back at NAVSTA Everett.